{"id":21525,"date":"2018-12-04T07:10:08","date_gmt":"2018-12-04T07:10:08","guid":{"rendered":"https:\/\/www.getsmarter.com\/blog\/?p=21525"},"modified":"2022-06-29T16:04:26","modified_gmt":"2022-06-29T14:04:26","slug":"5-steps-to-building-a-project-management-timeline","status":"publish","type":"post","link":"https:\/\/www.getsmarter.com\/blog\/5-steps-to-building-a-project-management-timeline\/","title":{"rendered":"5 Steps to Building a Project Management Timeline"},"content":{"rendered":"\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1140\" height=\"350\" src=\"https:\/\/www.getsmarter.com\/blog\/wp-content\/uploads\/2018\/12\/Microsite_Banner.jpg\" alt=\"\" class=\"wp-image-21572\" srcset=\"https:\/\/www.getsmarter.com\/blog\/wp-content\/uploads\/2018\/12\/Microsite_Banner.jpg 1140w, https:\/\/www.getsmarter.com\/blog\/wp-content\/uploads\/2018\/12\/Microsite_Banner-300x92.jpg 300w, https:\/\/www.getsmarter.com\/blog\/wp-content\/uploads\/2018\/12\/Microsite_Banner-768x236.jpg 768w, https:\/\/www.getsmarter.com\/blog\/wp-content\/uploads\/2018\/12\/Microsite_Banner-1024x314.jpg 1024w\" sizes=\"auto, (max-width: 1140px) 100vw, 1140px\" \/><\/figure>\n\n\n\n<p>In 2017, the Project Management Institute (PMI) conducted its 9th Global Management Survey to determine why some projects fail. <strong>The results revealed the number one reason to be a lack of clear goals<\/strong>.<sup>1<\/sup><\/p>\n\n\n\n<p>The ability to plan and focus on business results, while continually ensuring all project goals align with the company\u2019s strategic mission, is essentially what it means to be a Strategic Project Manager.<sup>2<\/sup> Instead of solely focusing on short-term results, Strategic Project Managers also have a long-term perspective.<sup>3<\/sup><\/p>\n\n\n\n<p>Project planning is directly associated with project success. According to a study presented at the PMI Global Congress of 2012, which researched the correlation between planning and project closure: \u201c<em>Overall, the literature points to a strong link between planning and project success. A summary of the available studies shows unexpectedly consistent empirical results for the correlation of planning and success<\/em>.\u201d<sup>4<\/sup><\/p>\n\n\n\n<p>The project management timeline serves as a visual overview of the project, and it can be presented in a number of ways. In order to create the most efficient project management timeline, it\u2019s important to remember to align team and stakeholder (these are all the members of your project team, executives, managers, sponsors, customers, and users) goals before planning, be realistic &#8211; ensure you\u2019re allotting accurate costs and time deliverables to each task or milestone, and consider referring to previous successful project plans as templates for your current project timeline.<sup>5<\/sup><\/p>\n\n\n\n<blockquote class=\"blockquote\"><div id=\"bq-spacing\">\n<p id=\"bq-main-copy\">The ability to plan and focus on business results, while continually ensuring all project goals align with the company\u2019s strategic mission, is essentially what it means to be a Strategic Project Manager.<\/p>\n<\/div><\/blockquote>\n\n\n\n<p>Whether you\u2019ve never built a project management timeline before, or you\u2019re experienced in this domain, the below five steps will ensure you\u2019re creating the most effective and sufficiently-detailed project map, before beginning your journey. Every project takes careful planning and attention to the right detail to succeed.<sup>6<\/sup><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">1) Create your scope statement<\/h2>\n\n\n\n<p>The scope of your project is one of the most critical parts of your plan. It determines what needs to be done to obtain or deliver the desired final result, and includes listing the project goals, activities, deadlines and costs.<sup>7<\/sup> The scope statement is usually the first step to be taken when planning a project.<sup>8<\/sup><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">2) Establish your work breakdown structure (WBS)<\/h2>\n\n\n\n<p>The WBS leads from the scope statement, and is used to break the work that needs to be done into manageable chunks. Creation of the WBS makes it easier for the Project Manager to estimate the costs, establish which tasks are dependent upon one another, assign responsibilities, and identify risk.<sup>9<\/sup><\/p>\n\n\n\n<p>To create a WBS you\u2019ll have to complete these four steps:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Step 1: Determine the major products or deliverables that need to be produced.<\/li><li>Step 2: Divide the determined deliverables into its component deliverables.<\/li><li>Step 3: Divide these workpieces further into component parts. Continue to subdivide all components until each component has enough detail for the purpose of planning and management.<\/li><li>Step 4: Group each work package required to create a sub-deliverable together. This will look almost like a task list (the activities that need to be completed by a specific time, using a certain level of effort).<sup>10<\/sup><\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"970\" height=\"551\" src=\"https:\/\/www.getsmarter.com\/blog\/wp-content\/uploads\/2018\/12\/Infographic1_Desktop.png\" alt=\"\" class=\"wp-image-21568\" srcset=\"https:\/\/www.getsmarter.com\/blog\/wp-content\/uploads\/2018\/12\/Infographic1_Desktop.png 970w, https:\/\/www.getsmarter.com\/blog\/wp-content\/uploads\/2018\/12\/Infographic1_Desktop-300x170.png 300w, https:\/\/www.getsmarter.com\/blog\/wp-content\/uploads\/2018\/12\/Infographic1_Desktop-768x436.png 768w\" sizes=\"auto, (max-width: 970px) 100vw, 970px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">3) Create your to-do lists<\/h2>\n\n\n\n<p>A to-do list can be created for each work package by establishing everything that needs to be done to get from the starting point to the finish. During this process, determine which tasks are dependent upon one another (in other words, activity B cannot begin until activity A is complete) and which tasks can run concurrently.<\/p>\n\n\n\n<p>Consider the length of each task and whether certain task due dates can have a float. Float, or slack, is the amount of time an activity can be delayed without affecting the project completion date.<sup>11<\/sup><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">4) Determine resources, timeframes and milestones<\/h2>\n\n\n\n<p>Decipher how long a task will take and what is needed to ensure it is completed by the allocated time. In order to determine whether the project is progressing at a sufficient speed, it\u2019s important to determine milestones to be included in the project management timeline. Project milestones are used to delineate a point within the project timeline. Milestones are a great management tool to highlight the start or finish of any task. By noting the completed milestones, it\u2019s possible to measure the distance from the finish line of your project.<sup>12<\/sup><\/p>\n\n\n\n<p>Show your milestones to your stakeholders to ensure they can take comfort in knowing you\u2019re on track, and in line with schedule.<\/p>\n\n\n\n<blockquote class=\"blockquote\"><div id=\"bq-spacing\">\n<p id=\"bq-main-copy\">Float, or slack, is the amount of time an activity can be delayed without affecting the project completion date.<\/p>\n<\/div><\/blockquote>\n\n\n\n<h2 class=\"wp-block-heading\">5) Choose your visuals and build your timeline<\/h2>\n\n\n\n<p>Build your project management timeline. There are a number of ways to represent the data in a visually appealing and organised way. Many project managers use software to build their timeline, or build a Gantt chart using Excel.<sup>13<\/sup><\/p>\n\n\n\n<p>A Gantt chart is a bar chart which effectively represents the dependency relationships between tasks, as well as the status of the schedule. To build a successful Gantt chart, be sure to include:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>The project start date<\/li><li>All project tasks<\/li><li>Who will be working on each task<\/li><li>Task start and finish dates<\/li><li>Task durations<\/li><li>How tasks group together, overlap and are dependent upon one another<\/li><li>The project finish date<\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"970\" height=\"551\" src=\"https:\/\/www.getsmarter.com\/blog\/wp-content\/uploads\/2018\/12\/Infographic2_Desktop.png\" alt=\"\" class=\"wp-image-21570\" srcset=\"https:\/\/www.getsmarter.com\/blog\/wp-content\/uploads\/2018\/12\/Infographic2_Desktop.png 970w, https:\/\/www.getsmarter.com\/blog\/wp-content\/uploads\/2018\/12\/Infographic2_Desktop-300x170.png 300w, https:\/\/www.getsmarter.com\/blog\/wp-content\/uploads\/2018\/12\/Infographic2_Desktop-768x436.png 768w\" sizes=\"auto, (max-width: 970px) 100vw, 970px\" \/><\/figure>\n\n\n\n<p><span style=\"font-weight: 400;\">While there are a number of ways to build a project management timeline, the most important element is not necessarily the visuals, but rather the ability to stick to it, or to adjust tasks without affecting the entire project.<\/span><\/p>\n\n\n\n<p>Learn how to approach and execute projects more effectively and efficiently with the <a href=\"https:\/\/www.getsmarter.com\/products\/uct-project-management-foundations-online-short-course\" target=\"_blank\" rel=\"noreferrer noopener\">UCT Project Management Foundations online short course<\/a>.<\/p>\n\n\n<div class=\"related-programme-block\">\n<div class=\"related-programme\" onclick=\"window.open('https:\/\/www.getsmarter.com\/products\/uct-project-management-foundations-online-short-course', '_blank')\">\n    <div class=\"row\">\n        <div class=\"col-12 col-md-11\">\n            <div class=\"related-programme__school-logo-container\">\n            <a href=\"https:\/\/www.getsmarter.com\/universities\/university-of-cape-town\" target=\"_blank\" class=\"related-programme__school-logo-link\">\n                <img decoding=\"async\" src=\"https:\/\/www.getsmarter.com\/blog\/wp-content\/uploads\/2018\/09\/UCT_logo.png\" alt=\"School Logo\" class=\"related-programme__school-logo\">\n            <\/a>\n            <\/div>\n            <div class=\"related-programme__copy\">\n            <a href=\"https:\/\/www.getsmarter.com\/universities\/university-of-cape-town\" target=\"_blank\" class=\"related-programme__school-name\">\n                University of Cape Town (UCT)            <\/a><br>\n            <a href=\"https:\/\/www.getsmarter.com\/products\/uct-project-management-foundations-online-short-course\" target=\"_blank\" class=\"related-programme__programme-name\">\n                Project Management Foundations online short course            <\/a>\n            <\/div>\n        <\/div>\n        <div class=\"col-md-1 related-programme__chevron-column\">\n            <div class=\"related-programme__icon-container\">\n                <img decoding=\"async\" class=\"add-btn\" src=\"https:\/\/www.getsmarter.com\/blog\/wp-content\/themes\/blog\/assets\/icn_arrow-circle_right.svg\" alt=\"Read More Icon\">\n            <\/div>\n        <\/div>\n    <\/div>\n<\/div>\n<\/div>\n\n\n\n<div id=\"accordion\">\n<div class=\"card\">\n<div id=\"headingOne\" class=\"card-header\">\n<h6 class=\"mb-0\"><button class=\"btn\" style=\"background-color: transparent;\" data-toggle=\"collapse\" data-target=\"#sources\" aria-expanded=\"true\" aria-controls=\"sources\"> <strong>Click here to view sources<\/strong> <\/button><\/h6>\n<\/div>\n<div id=\"sources\" class=\"collapse\" aria-labelledby=\"headingOne\" data-parent=\"#accordion\">\n<div class=\"card-body\">\n<ul class=\"mx-0\" style=\"list-style: none;\">\n<li class=\"mb-4\"><sup>1<\/sup> Pulse of the Profession. (2017). \u2018Success rates rise: transforming the high cost of low performance\u2019. Retrieved from <a href=\"http:\/\/www.pmi.org\/-\/media\/pmi\/documents\/public\/pdf\/learning\/thought-leadership\/pulse\/pulse-of-the-profession-2017.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">PMI<\/a>.<\/li>\n<li class=\"mb-4\"><sup>2<\/sup> Duggan, T. \u2018What Are the Roles &amp; Responsibilities of the Strategic Project Manager?\u2019 Retrieved from <a href=\"https:\/\/smallbusiness.chron.com\/roles-responsibilities-strategic-project-manager-10260.html\" target=\"_blank\" rel=\"noopener noreferrer\">Chron<\/a>.<\/li>\n<li class=\"mb-4\"><sup>3<\/sup> Duggan, T. \u2018What Are the Roles &amp; Responsibilities of the Strategic Project Manager?\u2019 Retrieved from <a href=\"https:\/\/smallbusiness.chron.com\/roles-responsibilities-strategic-project-manager-10260.html\" target=\"_blank\" rel=\"noopener noreferrer\">Chron<\/a>.<\/li>\n<li class=\"mb-4\"><sup>4<\/sup> Serrador, P. (2012). \u2018The importance of the planning phase to project success\u2019. Retrieved from <a href=\"https:\/\/www.pmi.org\/learning\/library\/importance-planning-phase-project-success-6021\" target=\"_blank\" rel=\"noopener noreferrer\">PMI<\/a>.<\/li>\n<li class=\"mb-4\"><sup>5<\/sup> Team Clarizen. (Dec, 2017). \u2018Who Are Project Management Stakeholders?\u2019 Retrieved from <a href=\"https:\/\/www.clarizen.com\/project-management-stakeholders\/\" target=\"_blank\" rel=\"noopener noreferrer\">Clarizen<\/a>.<\/li>\n<li class=\"mb-4\"><sup>6<\/sup> Palmer, E. (Oct,2018). \u2018Five Factors That Lead to Successful Projects\u2019. Retrieved from <a href=\"https:\/\/project-management.com\/five-factors-that-lead-to-successful-projects\/\" target=\"_blank\" rel=\"noopener noreferrer\">project-management.com<\/a>.<\/li>\n<li class=\"mb-4\"><sup>7<\/sup> Stallsworth, E. (2014). \u2018Writing a Scope Statement\u2019. Retrieved from <a href=\"https:\/\/www.brighthubpm.com\/templates-forms\/2491-writing-a-scope-statement\/\" target=\"_blank\" rel=\"noopener noreferrer\">Bright Hub Project Management<\/a>.<\/li>\n<li class=\"mb-4\"><sup>8<\/sup> Bakhsh, H.M. (2018). \u2018What are the first steps of planning a construction project?\u2019 Retrieved from <a href=\"https:\/\/www.bayt.com\/en\/specialties\/q\/393697\/what-are-the-first-steps-of-planning-a-construction-project\/\" target=\"_blank\" rel=\"noopener noreferrer\">Bayt<\/a>.<\/li>\n<li class=\"mb-4\"><sup>9<\/sup> Christensen, E. (2017). \u2018How to Create a Work Breakdown Structure and Why You Should\u2019. Retrieved from <a href=\"https:\/\/www.lucidchart.com\/blog\/how-to-create-a-work-breakdown-structure-and-why-you-should\" target=\"_blank\" rel=\"noopener noreferrer\">LucidChart<\/a>.<\/li>\n<li class=\"mb-4\"><sup>10<\/sup> \u2018Project Planning\u2019. Retrieved from <a href=\"https:\/\/www.officetimeline.com\/project-management\/project-planning\" target=\"_blank\" rel=\"noopener noreferrer\">Office Timeline<\/a>.<\/li>\n<li class=\"mb-4\"><sup>11<\/sup> Wiley, D., et al. \u2018Project Management for Instructional Designers\u2019. Retrieved from <a href=\"https:\/\/pm4id.org\/chapter\/8-3-critical-path-and-float\/\" target=\"_blank\" rel=\"noopener noreferrer\">PressBooks<\/a>.<\/li>\n<li class=\"mb-4\"><sup>12<\/sup> Westland, J. (2018). \u2018What Are Milestones in Project Management?\u2019 Retrieved from <a href=\"https:\/\/www.projectmanager.com\/blog\/milestones-project-management\" target=\"_blank\" rel=\"noopener noreferrer\">ProjectManager<\/a>.<\/li>\n<li class=\"mb-4\"><sup>13<\/sup> Team Clarizen. (Feb,2018). \u2018How to Make a Project Timeline That Works.\u2019 Retrieved from <a href=\"https:\/\/www.clarizen.com\/make-project-timeline-works-2\/\" target=\"_blank\" rel=\"noopener noreferrer\">Clarizen<\/a>.<\/li>\n<\/ul>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>In 2017, the Project Management Institute (PMI) conducted its 9th Global Management Survey to determine why some projects fail. The results revealed the number one reason to be a lack of clear goals.1 The ability to plan and focus on business results, while continually ensuring all project goals align with the company\u2019s strategic mission, is [&hellip;]<\/p>\n","protected":false},"author":74,"featured_media":21573,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[1],"tags":[122,129],"article-format":[],"class_list":["post-21525","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-career-advice","tag-business-management","tag-project-management"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.2 (Yoast SEO v26.2) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>5 Steps to Building a Project Management Timeline - GetSmarter Blog<\/title>\n<meta name=\"description\" content=\"Every project takes careful planning to succeed. Here are 5 steps to ensure that you&#039;re building an effective project management timeline.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.getsmarter.com\/blog\/5-steps-to-building-a-project-management-timeline\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"5 Steps to Building a Project Management Timeline\" \/>\n<meta property=\"og:description\" content=\"Every project takes careful planning to succeed. Here are 5 steps to ensure that you&#039;re building an effective project management timeline.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.getsmarter.com\/blog\/5-steps-to-building-a-project-management-timeline\/\" \/>\n<meta property=\"og:site_name\" content=\"GetSmarter Blog\" \/>\n<meta property=\"article:published_time\" content=\"2018-12-04T07:10:08+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-06-29T14:04:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.getsmarter.com\/blog\/wp-content\/uploads\/2018\/12\/Microsite-Thumbnail.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"360\" \/>\n\t<meta property=\"og:image:height\" content=\"200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Shameel Mohanlal\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"GetSmarter Staff\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.getsmarter.com\/blog\/5-steps-to-building-a-project-management-timeline\/#primaryimage\",\"url\":\"https:\/\/www.getsmarter.com\/blog\/wp-content\/uploads\/2018\/12\/Microsite-Thumbnail.jpg\",\"contentUrl\":\"https:\/\/www.getsmarter.com\/blog\/wp-content\/uploads\/2018\/12\/Microsite-Thumbnail.jpg\",\"width\":360,\"height\":200},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.getsmarter.com\/blog\/5-steps-to-building-a-project-management-timeline\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.getsmarter.com\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Blog\",\"item\":\"https:\/\/www.getsmarter.com\/blog\"}]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"5 Steps to Building a Project Management Timeline - GetSmarter Blog","description":"Every project takes careful planning to succeed. Here are 5 steps to ensure that you're building an effective project management timeline.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.getsmarter.com\/blog\/5-steps-to-building-a-project-management-timeline\/","og_locale":"en_US","og_type":"article","og_title":"5 Steps to Building a Project Management Timeline","og_description":"Every project takes careful planning to succeed. Here are 5 steps to ensure that you're building an effective project management timeline.","og_url":"https:\/\/www.getsmarter.com\/blog\/5-steps-to-building-a-project-management-timeline\/","og_site_name":"GetSmarter Blog","article_published_time":"2018-12-04T07:10:08+00:00","article_modified_time":"2022-06-29T14:04:26+00:00","og_image":[{"width":360,"height":200,"url":"https:\/\/www.getsmarter.com\/blog\/wp-content\/uploads\/2018\/12\/Microsite-Thumbnail.jpg","type":"image\/jpeg"}],"author":"Shameel Mohanlal","twitter_card":"summary_large_image","twitter_misc":{"Written by":"GetSmarter Staff","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.getsmarter.com\/blog\/5-steps-to-building-a-project-management-timeline\/#primaryimage","url":"https:\/\/www.getsmarter.com\/blog\/wp-content\/uploads\/2018\/12\/Microsite-Thumbnail.jpg","contentUrl":"https:\/\/www.getsmarter.com\/blog\/wp-content\/uploads\/2018\/12\/Microsite-Thumbnail.jpg","width":360,"height":200},{"@type":"BreadcrumbList","@id":"https:\/\/www.getsmarter.com\/blog\/5-steps-to-building-a-project-management-timeline\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.getsmarter.com"},{"@type":"ListItem","position":2,"name":"Blog","item":"https:\/\/www.getsmarter.com\/blog"}]}]}},"_links":{"self":[{"href":"https:\/\/www.getsmarter.com\/blog\/wp-json\/wp\/v2\/posts\/21525","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.getsmarter.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.getsmarter.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.getsmarter.com\/blog\/wp-json\/wp\/v2\/users\/74"}],"replies":[{"embeddable":true,"href":"https:\/\/www.getsmarter.com\/blog\/wp-json\/wp\/v2\/comments?post=21525"}],"version-history":[{"count":56,"href":"https:\/\/www.getsmarter.com\/blog\/wp-json\/wp\/v2\/posts\/21525\/revisions"}],"predecessor-version":[{"id":47219,"href":"https:\/\/www.getsmarter.com\/blog\/wp-json\/wp\/v2\/posts\/21525\/revisions\/47219"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.getsmarter.com\/blog\/wp-json\/wp\/v2\/media\/21573"}],"wp:attachment":[{"href":"https:\/\/www.getsmarter.com\/blog\/wp-json\/wp\/v2\/media?parent=21525"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.getsmarter.com\/blog\/wp-json\/wp\/v2\/categories?post=21525"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.getsmarter.com\/blog\/wp-json\/wp\/v2\/tags?post=21525"},{"taxonomy":"article-format","embeddable":true,"href":"https:\/\/www.getsmarter.com\/blog\/wp-json\/wp\/v2\/article-format?post=21525"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}